EnergyProblem 0002
The constraint on the energy transition moved from manufacturing to administration, and no tooling followed it. Projects sit in interconnection queues longer than they took to design, studies are redone by hand each time the queue ahead reshuffles, and developers cannot see where they stand or what would move them. Most of the capacity that enters the queue is eventually withdrawn, often after years of waiting.
Who lives with itIndependent power producers · utility interconnection teams · the financiers whose models assume a connection date
Why nowLawrence Berkeley National Laboratory's latest queue analysis counts roughly 8,200 active projects representing over two terawatts of generation and storage, a median wait from request to operation of more than five years, and about three quarters of the capacity that requested connection between 2000 and 2020 later withdrawn.
Why it matters · the JudgeA queueing and document problem wearing an engineering costume, exactly the kind that goes unsolved because no single party owns both ends of it. Faster paperwork is the cheapest capacity available anywhere on the grid.
Inspired by reporting from Lawrence Berkeley National Laboratory